Sorry I found no matches, Please try again. 176
vid = 5271pws_id = 351925pws_id = 351925
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.226.226.158 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Vaglefield Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Vaglefield Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, EX22 6NY    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: February 2014

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Hub Height 60   Avg for all turbines: Avg. Elevation:
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Vaglefield Farm Holsworthy EX22 6NY England

 Associated Companies.

Relationship Company (For: Vaglefield )
OperatorGVO WInd
FinanceTemporis Capital LLP

 DECC Data on this Project: Vaglefield :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Vaglefield: Wind :

Site Name: Vaglefield
Generator Type: Wind
Scheme : REGO Generator ID: G02537NWEN
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 9/2/2014    
Applicant: GVO Wind No. 17 Limited
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: Vaglefield Farm Holsworthy EX22 6NY England
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
103 21.46% Issued
75 15.63% Issued
194 40.42% Redeemed
171 35.63% Redeemed
01/01/2017 126 26.25% Redeemed
01/12/2016 - 31/12/2016 00 106 22.08% Issued
01/11/2016 - 30/11/2016 00 124 25.83% Issued
01/10/2016 - 31/10/2016 00 91 18.96% Issued
01/09/2016 - 30/09/2016 00 111 23.13% Issued
Aug-16 00 110 22.92% Issued
Jul-16 00 102 21.25% Issued
Jul-16 00 102 21.25% Issued
Jun-16 00 79 16.46% Issued
May-16 00 94 19.58% Issued
Apr-16 00 124 25.83% Issued
Mar-16 00 147 30.63% Redeemed
Feb-16 00 176 36.67% Redeemed
Jan-16 00 192 40.00% Redeemed
Dec-15 00 271 56.46% Redeemed
Nov-15 00 217 45.21% Redeemed
Oct-15 00 81 16.88% Redeemed
Sep-15 00 88 18.33% Redeemed
Aug-15 00 96 20.00% Redeemed
Jul-15 1360 1 0.21% Redeemed
Jun-15 1120 111 23.13% Redeemed
May-15 1540 9 1.88% Redeemed
Apr-15 1070 106 22.08% Redeemed
Mar-15 1550 155 32.29% Redeemed
Feb-15 1280 128 26.67% Redeemed
Jan-15 2030 203 42.29% Redeemed
Dec-14 1910 191 39.79% Redeemed
Nov-14 1130 113 23.54% Redeemed
Oct-14 1420 142 29.58% Redeemed
Sep-14 400 40 8.33% Redeemed
176 36.67% Issued
156 32.50% Issued
100 20.83% Issued
135 28.13% Issued
101 21.04% Issued
151 31.46% Issued
127 26.46% Issued
136 28.33% Issued
160 33.33% Issued
217 45.21% Issued

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/3/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351925

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School