Sorry I found no matches, Please try again. 176
vid = 5272pws_id = 353602pws_id = 353602
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.144.8.68 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

The Hole Farm Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

The Hole Farm Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, EX21 5AS    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: June 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 0
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

The Hole FarmBeaworthy EX21 5AS England

 Associated Companies.

Relationship Company (For: The Hole Farm )
OperatorGVO WInd
FinanceTemporis Capital LLP

 DECC Data on this Project: The Hole Farm :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: The Hole Farm: Wind :

Site Name: The Hole Farm Wind Turbine
Generator Type: Wind
Scheme : REGO Generator ID: G02767NWEN
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 6/30/2015    
Applicant: GVO WIND NO. 22 LIMITED
Applicant Address: Temporis Capital LLP Berger House 36-38 London W1J 5AE England
Address: The Hole Farm Beaworthy EX21 5AS England
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
121 25.21% Issued
85 17.71% Issued
220 45.83% Redeemed
190 39.58% Redeemed
01/01/2017 160 33.33% Redeemed
01/12/2016 - 31/12/2016 00 141 29.38% Issued
01/11/2016 - 30/11/2016 00 142 29.58% Issued
01/10/2016 - 31/10/2016 00 118 24.58% Issued
Oct-16 00 118 24.58% Pending Tr
Sep-16 00 138 28.75% Issued
01/09/2016 - 30/09/2016 00 138 28.75% Issued
Aug-16 00 122 25.42% Issued
Jul-16 00 101 21.04% Issued
Jul-16 00 101 21.04% Issued
Jun-16 00 85 17.71% Issued
May-16 00 112 23.33% Issued
Apr-16 00 136 28.33% Issued
Mar-16 00 173 36.04% Redeemed
Feb-16 00 194 40.42% Redeemed
Jan-16 00 241 50.21% Redeemed
Dec-15 00 300 62.50% Issued
Nov-15 00 216 45.00% Redeemed
Oct-15 00 113 23.54% Redeemed
Sep-15 00 100 20.83% Redeemed
Aug-15 00 99 20.63% Redeemed
Jul-15 1410 141 29.38% Redeemed
Jun-15 00 141 29.38% Revoked
185 38.54% Issued
105 21.88% Issued
152 31.67% Issued
140 29.17% Issued
233 48.54% Issued
168 35.00% Issued
127 26.46% Issued
172 35.83% Issued
107 22.29% Issued
181 37.71% Issued

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353602

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School