Loading
Page views this IP this session = 1 of 10 unsubscribed pagesMucomir
Mucomir (Hydro , Active) Location in the UK : Scotland, PH34 4EQ Type of installation: Hydro on/offshore: on Turbines :0 Capacity : 2 MW Approx Date of 1st power generation: January 1962
/YES
Mucomir Power Station Gairlochy By Spean Bridge PH34 4EQ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Mucomir 2 MW
|
Energy Type: |
Small Hydro |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
469 / EN00073
District:
|
Applicant: |
Scottish and Southern Energy (SSE)
Application :
|
(Go to search to find Application) |
Site Address: |
Mucomir
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
218350 / 218350
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/1962
|
This Record Last Updated: |
4/4/2006
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Mucomir Hydro Power Station
|
Generator Type: |
Hydro
|
Scheme : |
REGO
|
Generator ID: |
G01934HYSC
|
Capacity: |
1482
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
9/6/2017
|
|
|
Applicant: |
SSE Generation Ltd
|
Applicant Address: |
Scottish Hydro Electric plc
Inveralmond House
200 Dunkeld Road
Perth
PH1 3AQ
Scotland
|
Address: |
Mucomir Power Station
Gairlochy
By Spean Bridge
PH34 4EQ
Scotland
|
|
Assumptions: Capacity: 1482kW 1.482 MW, Thus over the month Capacity * 720 hours per month = 1067.04 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 544 | 36.71% | Issued | | | | 345 | 23.28% | Issued | | | | 650 | 43.86% | Issued | | | | 706 | 47.64% | Issued | | | | 699 | 47.17% | Issued | | | | 318 | 21.46% | Issued | | | | 706 | 47.64% | Issued |
|
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|