Spalding Biomass Energy

Spalding (Biomass , Active)

 General Information.

Location in the UK : England, PE12 6BL    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 14.5 MW
Approx Date of 1st power generation: July 2015

/YES

 Comment

 Address

Clay Lane Spalding Drove Spalding PE12 6BL England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Spalding )

 DECC Data on this Project: Spalding :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Spalding     14.5 MW
Energy Type: Biomass (dedicated)
County: Lincolnshire     Country: England     LPA: South Holland District Council
Site ID and Reference: 6165 /     District:
Applicant: SPEP     Application : (Go to search to find Application)
Site Address: Clay Lane , Spalding Drove , Spalding
  PE12 6BL
County: Lincolnshire Region: East Midlands
OS Coordinates: 525296 / 525296
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/1/2015    
Generator Live 7/8/2015 This Record Last Updated: 8/23/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Spalding: Biomass :

Site Name: Spalding
Generator Type: Biomass (e.g. Plant or animal matter)
Scheme : REGO Generator ID: G01663BWEN
Capacity: 14500 Status: Live
Accreditation Date:    
Commission Date: 1/29/2013    
Applicant: SPEP Ltd
Applicant Address: Rock House Scotgate Stamford PE9 2YQ England
Address: Clay Lane Spalding Drove Spalding PE12 6BL England
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 14500kW 14.5 MW,
Thus over the month Capacity * 720 hours per month = 10440 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

Project Info
Bourne solar farm is connected to National Grid
A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid. Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

Bourne solar farm is connected to National Grid
Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

Bourne solar farm is connected to National Grid
A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid.Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

Noisy wind farm 'drove couple out of their home'
Jane and Julian Davis, moved out of Grays Farm, Deeping St Nicholas, near SPALDING, Lincs, four years ago because of the strain of living with the incessant noise.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School