Loading
Page views this IP this session = 1 of 10 unsubscribed pagesSpalding Biomass Energy
Spalding (Biomass , Active) Location in the UK : England, PE12 6BL Type of installation: Biomass on/offshore: on Turbines :0 Capacity : 14.5 MW Approx Date of 1st power generation: July 2015
/YES
Clay Lane Spalding Drove Spalding PE12 6BL England
Relationship |
Company (For:
Spalding
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Spalding 14.5 MW
|
Energy Type: |
Biomass (dedicated) |
County: |
Lincolnshire Country: England LPA: South Holland District Council
|
Site ID and Reference: |
6165 /
District:
|
Applicant: |
SPEP
Application :
|
(Go to search to find Application) |
Site Address: |
Clay Lane
, Spalding Drove
, Spalding
|
|
PE12 6BL
|
County: |
Lincolnshire Region: East Midlands
|
OS Coordinates: |
525296 / 525296
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
2/1/2015
|
|
|
Generator Live |
7/8/2015
|
This Record Last Updated: |
8/23/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Spalding
|
Generator Type: |
Biomass (e.g. Plant or animal matter)
|
Scheme : |
REGO
|
Generator ID: |
G01663BWEN
|
Capacity: |
14500
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
1/29/2013
|
|
|
Applicant: |
SPEP Ltd
|
Applicant Address: |
Rock House
Scotgate
Stamford
PE9 2YQ
England
|
Address: |
Clay Lane
Spalding Drove
Spalding
PE12 6BL
England
|
|
Assumptions: Capacity: 14500kW 14.5 MW, Thus over the month Capacity * 720 hours per month = 10440 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Sorry I found no matches, Please try again.
|
Project Info |
Bourne solar farm is connected to National Grid A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid.
Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.
Bourne solar farm is connected to National Grid Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.
Bourne solar farm is connected to National Grid A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid.Limes Farm in SPALDING Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.
Noisy wind farm 'drove couple out of their home' Jane and Julian Davis, moved out of Grays Farm, Deeping St Nicholas, near SPALDING, Lincs, four years ago because of the strain of living with the incessant noise.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|