Lisahally Biomass Energy

Lisahally (Biomass , Active)

 General Information.

Location in the UK : England, BT47 6FL    
Type of installation: Biomass    on/offshore: on
Turbines :0  Capacity : 15 MW
Approx Date of 1st power generation: July 2015

/YES

 Comment

 Address

18 Lisahally Road Derry BT476FL Northern Ireland

 Associated Companies.

Relationship Company (For: Lisahally )
DeveloperEvermore Energy
OwnerEvermore Energy
OperatorEvermore Energy

 DECC Data on this Project: Lisahally :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Evermore Renewable Energy (CHP) / Lisahally Power Station     15 MW
Energy Type: Biomass (dedicated)
County: Co. Derry / Londonderry     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 124 / B0251     District:
Applicant: ERE Developments     Application : A/2010/0030/F (Go to search to find Application)
Site Address: Site between Temple Road and Maydown Road, Lisahally opposite location of former dwelling 38 Temple Road,
  BT47 6FL
County: Co. Derry / Londonderry Region: Northern Ireland
OS Coordinates: 64627 / 64627
Development Status: Operational
Application Submitted: 1/19/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/19/2013    
Generator Live 7/23/2015 This Record Last Updated: 11/3/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Lisahally: Biomass :

Site Name: Lisahally Power Station
Generator Type: Biomass (e.g. Plant or animal matter)
Scheme : REGO Generator ID: G00017BWNI
Capacity: 15800 Status: Live
Accreditation Date: 1/19/2010    
Commission Date: 7/23/2015    
Applicant: ERE Developments Ltd
Applicant Address: 79 Chichester Street Belfast Belfast BT14JE Northern Ireland
Address: 18 Lisahally Road Derry BT476FL Northern Ireland
 
Assumptions: Capacity: 15800kW 15.8 MW,
Thus over the month Capacity * 720 hours per month = 11376 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/01/2018 7461 47.22% Issued
01/12/2017 9196 58.20% Retired
01/10/2017 316 2.00% Retired
01/09/2017 9389 59.42% Retired
01/08/2017 12310 77.91% Retired
01/07/2017 12254 77.56% Retired
01/06/2017 11546 73.08% Retired
01/04/2017 8219 52.02% Issued
01/03/2017 11647 73.72% Issued
01/02/2017 11698 74.04% Issued
01/01/2017 13013 82.36% Issued
Dec-16 21102 11558 73.15% Pending Tr
Nov-16 21026 11506 72.82% Retired
Oct-16 21780 11953 75.65% Retired
Sep-16 16169 8972 56.78% Retired
Aug-16 18819 10409 65.88% Retired
Jul-16 22071 12177 77.07% Retired
Jul-16 22071 12177 77.07% Issued
Jun-16 19258 10636 67.32% Pending Tr
May-16 21546 11848 74.99% Pending Tr
May-16 21546 11848 74.99% Retired
Apr-16 8037 4502 28.49% Pending Tr
Mar-16 20577 11261 71.27% Pending Tr
Feb-16 13950 7692 48.68% Pending Tr
Jan-16 13166 7262 45.96% Pending Tr
Dec-15 6650 3730 23.61% Pending Tr
Nov-15 17409 1 0.01% Retired
Oct-15 6660 3768 23.85% Retired
Sep-15 6588 4159 26.32% Retired
Aug-15 5847 4426 28.01% Retired
Jul-15 1505 1198 7.58% Retired

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School