vid = 5703pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:8630 Ind:1 IP: 13.59.87.145 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Bodtegir Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Bodtegir Wind Farm (Wind , Proposed)

 General Information.

Location in the UK : Wales, LL21 9AB    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 1.5 MW
Approx Date of 1st power generation:

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: Start Speed:
Capacity: Optimal Speed:
Rotor Diameter: Stop Speed:
Hub Height   Avg for all turbines: Avg. Elevation:
Web Page:
Comment:

 Address

Land at Bodtegir, part of the, Mwdwl Eithin, Nant Bach Wind Farm On Land At, Corwen

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Bodtegir )

 DECC Data on this Project: Bodtegir :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Bodtegir     1.5 MW
Energy Type: Wind Onshore
County: Clwyd     Country: Wales     LPA: Conwy County Borough Council
Site ID and Reference: 6033 /     District:
Applicant: Clean Earth Energy     Application : 0/42466 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.5
Height of Turbines: 100 Calculated capacity: 1.5
Site Address: Land at Bodtegir, part of the, Mwdwl Eithin, Nant Bach Wind Farm On Land At, Corwen
  LL21 9AB
County: Clwyd Region: Wales
OS Coordinates: 299554 / 299554
Development Status: Operational
Application Submitted: 2/12/2016 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/21/2017    
Generator Live 11/1/2017 This Record Last Updated: 1/15/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 4/20/2021    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Bodtegir: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School