Sorry I found no matches, Please try again. 176
vid = 5712pws_id = 350827pws_id = 350827
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.14.12.254 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Slieveglass Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Slieveglass Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, BT81 7RL    
Type of installation: Wind    on/offshore: on
Turbines :0  Capacity : 0 MW
Approx Date of 1st power generation: March 2017

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: 2B6 Start Speed: 3.5
Capacity: 6 Optimal Speed: 13
Rotor Diameter: 140 Stop Speed: 0
Hub Height 0   Avg for all turbines:0 Avg. Elevation: 235
Web Page: https://en.wind-turbine-models.com/turbines/1250-2-b-energy-2b6
Comment:

 Address

Slieveglass Mountain Bullock Park Castlederg BT81 7RL Northern Ireland

 Associated Companies.

Relationship Company (For: Slieveglass )
DeveloperEnergia Renewables

 DECC Data on this Project: Slieveglass :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Slieveglass     6.9 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 4065 / A0307     District:
Applicant: Slieveglass wind farm (Energia)     Application : J/2008/0088 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 6.9
Site Address: Bullock Park, Drumquin, Co. Tyrone
 
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 40796 / 40796
Development Status: Operational
Application Submitted: 1/28/2008 Planning Permission Granted
Application Determined: Permission refused: 4/30/2012
Construction Date: 9/1/2017    
Generator Live 8/10/2018 This Record Last Updated: 11/27/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 6/12/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 4/30/2012

 OFGEM Data on this Project: Slieveglass: Wind :

Site Name: Slieveglass Wind Farm
Generator Type: On-shore wind (NIRO code = NQ)
Scheme : RO Generator ID: P00494NQNI
Capacity: 6732 Status: Preliminary
Accreditation Date: 1/28/2008    
Commission Date: 3/31/2017    
Applicant: Slieveglass Wind Farm Limited
Applicant Address: Greenwood house 64 Newforge Lane Belfast BT9 5NF Northern Ireland
Address: Slieveglass Mountain Bullock Park Castlederg BT81 7RL Northern Ireland

 Calculations


Capacity: 0
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 0 m/s (0 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/5/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 0 start: 5 Optimum: 15/ Stop: 0 / wind: / ratio 350827

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School