Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBlood Hill Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Blood Hill Wind Farm (Wind , Active) Location in the UK : England, Norfolk Type of installation: Wind on/offshore: on Turbines :10 Capacity : 2.25 MW Approx Date of 1st power generation: December 1992
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Comment from user (Thanks) The ten .2Mw turbines have gone, so it looks as though the 10 x .2Mw turbines have been replaced by 2 x .6Mw machines.
Blood Hill is a wind farm near Hemsby in Norfolk, England. It is the smallest windfarm owned by E.ON; taking up 3 hectares. It has a nameplate capacity of 2.25MW which is enough to power 1000 homes at peak.
Model: |
Vestas V27
|
Start Speed: |
4
|
Capacity: |
0.23
|
Optimal Speed: |
14
|
Rotor Diameter: |
27
|
Stop Speed: |
25
|
Hub Height |
30 Avg for all turbines:30
|
Avg. Elevation: |
19
|
Web Page: |
|
Comment: |
|
Blood Hill nr. Coronation Farm Somerton Great Yarmouth Norfolk
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Bloodhills - repowering 1 MW
|
Energy Type: |
Wind Onshore |
County: |
Norfolk Country: England LPA: Great Yarmouth Borough Council
|
Site ID and Reference: |
3924 / C1356
District:
|
Applicant: |
The Farm Energy Partnership LLP
Application :
06/13/0093/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
0.5 |
Height of Turbines: |
|
Calculated capacity: |
1 |
Site Address: |
Bloodhills Farm, Bloodhills East Somerton Great Yarmouth NR29 4DU
|
|
|
County: |
Norfolk Region: Eastern
|
OS Coordinates: |
647642 / 647642
|
Development Status: |
Operational
|
Application Submitted: |
2/12/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
7/15/2014
|
|
|
Generator Live |
6/15/2015
|
This Record Last Updated: |
11/25/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Blood Hill Wind Farm 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Norfolk Country: England LPA: Great Yarmouth Borough Council
|
Site ID and Reference: |
3358 / 01018W4
District:
|
Applicant: |
ECONET LTD
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
0.14999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
1.5 |
Site Address: |
Blood Hill nr. Coronation Farm
, Somerton
, Great Yarmouth
, Norfolk
|
|
|
County: |
Norfolk Region: Eastern
|
OS Coordinates: |
646900 / 646900
|
Development Status: |
Decommissioned
|
Application Submitted: |
3/17/1998
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
8/6/1999
|
Construction Date: |
|
|
|
Generator Live |
7/24/2000
|
This Record Last Updated: |
1/9/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
8/6/1999 |
Site Name: |
Blood Hill Wind Farm - A
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00041RQEN
|
Capacity: |
2250
|
Status: |
Live
|
Accreditation Date: |
3/17/1998
|
|
|
Commission Date: |
9/1/1992
|
|
|
Applicant: |
Burnley Energy LLP
|
Applicant Address: |
The Brick Barn
Court Road
BIRCHINGTON
CT7 0PT
England
|
Address: |
Blood Hill Wind Farm
East SomertonEast SomertonNorfolk
England
|
Site Name: |
Blood Hill Wind Farm - A
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00502NWEN
|
Capacity: |
2250
|
Status: |
Live
|
Accreditation Date: |
3/17/1998
|
|
|
Commission Date: |
9/1/1992
|
|
|
Applicant: |
Burnley Energy LLP
|
Applicant Address: |
The Brick Barn
Court Road
BIRCHINGTON
CT7 0PT
England
|
Address: |
Blood Hill Wind Farm
East SomertonEast SomertonNorfolk
England
|
|
Assumptions: Capacity: 2250kW 2.25 MW, Thus over the month Capacity * 720 hours per month = 1620 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Jan-14 | 428 | 428 | 427 | 18.98% | Redeemed | Dec-13 | 359 | 360 | 1 | 0.04% | Expired | Nov-13 | 293 | 292 | 292 | 12.98% | Redeemed | Oct-13 | 425 | 425 | 425 | 18.89% | Redeemed | Sep-13 | 223 | 221 | 222 | 9.87% | Redeemed | Aug-13 | 135 | 133 | 135 | 6.00% | Redeemed | Jul-13 | 87 | 84 | 1 | 0.04% | Redeemed | Jun-13 | 209 | 206 | 208 | 9.24% | Redeemed | May-13 | 298 | 298 | 298 | 13.24% | Redeemed | Apr-13 | 374 | 376 | 376 | 16.71% | Redeemed | Mar-13 | 475 | 475 | 475 | 21.11% | Redeemed | Feb-13 | 318 | 318 | 318 | 14.13% | Redeemed | Jan-13 | 323 | 320 | 323 | 14.36% | Redeemed | Dec-12 | 436 | 436 | 436 | 19.38% | Redeemed | Nov-12 | 292 | 292 | 292 | 12.98% | Redeemed | Oct-12 | 252 | 252 | 253 | 11.24% | Redeemed | Sep-12 | 234 | 233 | 234 | 10.40% | Redeemed | Aug-12 | 153 | 151 | 153 | 6.80% | Redeemed | Jul-12 | 115 | 112 | 115 | 5.11% | Redeemed | Jun-12 | 295 | 295 | 295 | 13.11% | Redeemed | May-12 | 218 | 220 | 220 | 9.78% | Redeemed | Apr-12 | 304 | 303 | 303 | 13.47% | Redeemed | Mar-12 | 163 | 161 | 163 | 7.24% | Redeemed | Feb-12 | 370 | 370 | 370 | 16.44% | Redeemed | Jan-12 | 449 | 449 | 449 | 19.96% | Redeemed | Dec-11 | 620 | 620 | 620 | 27.56% | Redeemed | Nov-11 | 337 | 337 | 337 | 14.98% | Redeemed | Oct-11 | 378 | 378 | 378 | 16.80% | Redeemed | Sep-11 | 307 | 307 | 307 | 13.64% | Redeemed | Aug-11 | 163 | 161 | 162 | 7.20% | Redeemed | Jul-11 | 228 | 228 | 228 | 10.13% | Redeemed | Jun-11 | 192 | 192 | 192 | 8.53% | Redeemed | May-11 | 338 | 337 | 337 | 14.98% | Redeemed | Apr-11 | 240 | 238 | 240 | 10.67% | Redeemed | Mar-11 | 205 | 204 | 206 | 9.16% | Redeemed | Feb-11 | 401 | 401 | 401 | 17.82% | Redeemed | Jan-11 | 326 | 326 | 326 | 14.49% | Redeemed | Dec-10 | 302 | 301 | 301 | 13.38% | Redeemed | Nov-10 | 383 | 383 | 383 | 17.02% | Redeemed | Oct-10 | 285 | 285 | 285 | 12.67% | Redeemed |
|
Capacity: 4.5 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|