vid = 5977pws_id = 324254pws_id = 324254 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:8630 Ind:1 IP: 13.59.58.61 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Kingspan Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Kingspan Wind Farm (Wind , Deleted)

 General Information.

Location in the UK : Wales, CH8 7GJ    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 1.8 MW
Approx Date of 1st power generation: January 2019

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: 2B6 Start Speed: 3.5
Capacity: 6 Optimal Speed: 13
Rotor Diameter: 140 Stop Speed: 0
Hub Height 0   Avg for all turbines: Avg. Elevation:
Web Page: https://en.wind-turbine-models.com/turbines/1250-2-b-energy-2b6
Comment:

 Address

Kingspan Ltd, 2-4 Bagillt Road, Greenfield, Holywell

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Kingspan )

 DECC Data on this Project: Kingspan :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Kingspan     1.8 MW
Energy Type: Wind Onshore
County: Flintshire     Country: Wales     LPA: Flintshire County Council
Site ID and Reference: 4790 /     District:
Applicant: Kingspan     Application : 52922 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 0.90000000000000002
Height of Turbines: 78 Calculated capacity: 1.8
Site Address: Kingspan Ltd, 2-4 Bagillt Road, Greenfield, Holywell
  CH8 7GJ
County: Flintshire Region: Wales
OS Coordinates: 320053 / 320053
Development Status: Operational
Application Submitted: 11/19/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 3/19/2018    
Generator Live 1/11/2019 This Record Last Updated: 1/22/2019
RO Banding (ROC/MWh) 0.9 FiT Tariff (p/kWh): 3
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 4/14/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Kingspan: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 324254

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School