Page views this IP this session = 5 of 5 unsubscribed pagesWalney Extension Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Walney Extension Wind Farm (Wind , Active) Location in the UK : England, LA3 3JJ Type of installation: Wind on/offshore: off Turbines :79 Capacity : 553 MW Approx Date of 1st power generation:
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Vestas V164-8MW
|
Start Speed: |
0
|
Capacity: |
8
|
Optimal Speed: |
0
|
Rotor Diameter: |
164
|
Stop Speed: |
0
|
Hub Height |
105 Avg for all turbines:104
|
Avg. Elevation: |
-81
|
Web Page: |
https://en.wikipedia.org/wiki/Vestas_V164 |
Comment: |
MHI VESTAS on the Isle of Wight has been selected as the preferred turbine supplier for the proposed Navitus Bay offshore wind farm.
The turbines’ 80m long blades will be made at the company’s factory, supporting the 200 local jobs currently being created there.
MHI Vestas will supply its latest V164-8MW wind turbine.
|
Walney Offshore Windfarm Phase I Near Walney Island LA3 3JJ England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Walney 3 659 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2533 / A0374
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
110 |
Turbine Capacity: |
6 |
Height of Turbines: |
222 |
Calculated capacity: |
660 |
Site Address: |
14km off Walney Island, Irish Sea
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
286289 / 286289
|
Development Status: |
Operational
|
Application Submitted: |
7/30/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2017
|
|
|
Generator Live |
9/13/2018
|
This Record Last Updated: |
6/4/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
11/7/2019 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Walney Extension
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G01177FWEN
|
Capacity: |
648000
|
Status: |
Live
|
Accreditation Date: |
7/30/2013
|
|
|
Commission Date: |
9/2/2017
|
|
|
Applicant: |
DONG Energy Walney Extension (UK) Ltd.
|
Applicant Address: |
c/o DONG Energy Wind A/S
Nesa Allé 1
Gentofte
2820
Overseas - Denmark
|
Address: |
Cavendish Dock Road
Barrow-in-Furness
Cumbria
LA14 2GR
England
|
|
Assumptions: Capacity: 648000kW 648 MW, Thus over the month Capacity * 720 hours per month = 466560 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 109939 | 16.97% | Issued | | | | 11269 | 1.74% | Issued | | | | 101425 | 15.65% | Issued |
|
Capacity: 1106 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 0 m/s (0 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|