vid = 6000pws_id = 353796pws_id = 353796 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 5( 1 Seen ) ID:8630 Ind:1 IP: 13.58.96.83 {832) YESU WSHW: 1/5
Loading
Page views this IP this session = 1 of 5 unsubscribed pages

Common Barn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Common Barn Wind Farm (Wind , Active)

 General Information.

Location in the UK : England,    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 6.15 MW
Approx Date of 1st power generation: May 2019

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Consented. Contract for Difference (CFD) awarded in early 2015, project currently in construction expected to achieve commercial operation in first quarter 2019

 Turbine Make and Specs

Model: Senvion MM92 Start Speed: 4
Capacity: 2 Optimal Speed: 12
Rotor Diameter: 92 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 40
Web Page: http://www.repower.de/wind-power-solutions/wind-turbines/5m/
Comment: The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.

 Address

Church Farm, Southoe, Huntingdonshire

 Associated Companies.

Relationship Company (For: Common Barn )
OwnerTCI Renewables
OperatorTCI Renewables
DeveloperTCI Renewables

 DECC Data on this Project: Common Barn :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Common Barn Wind Farm     6.2 MW
Energy Type: Wind Onshore
County: Cambridgeshire     Country: England     LPA: Huntingdonshire District Council
Site ID and Reference: 4076 / AA522     District:
Applicant: TCI Renewables     Application : 1200803FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 9
Site Address: Church Farm, Southoe, Huntingdonshire
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 516918 / 516918
Development Status: Operational
Application Submitted: 5/15/2012 Planning Permission Granted
Application Determined: Permission refused: 12/5/2012
Construction Date: 1/15/2018    
Generator Live 5/9/2019 This Record Last Updated: 12/11/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 12/5/2012

 OFGEM Data on this Project: Common Barn: Wind :

 Calculations


Capacity: 12
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 12 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353796

Project Info
COMMON BARN Wind Farm

COMMON BARN Wind Farm

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School