Sorry I found no matches, Please try again. 176
vid = 6001pws_id = 350187pws_id = 350187 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.217.7.252 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Accolade Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Accolade Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, BS11 9FG    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2.5 MW
Approx Date of 1st power generation: June 2019

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: 2B6 Start Speed: 3.5
Capacity: 6 Optimal Speed: 13
Rotor Diameter: 140 Stop Speed: 0
Hub Height 75   Avg for all turbines:75 Avg. Elevation: 7
Web Page: https://en.wind-turbine-models.com/turbines/1250-2-b-energy-2b6
Comment:

 Address

Accolade Wines, Kings Weston Lane, Avonmouth, Bristol, Avon

 Associated Companies.

Relationship Company (For: Accolade )
DeveloperCleanearth Energy

 DECC Data on this Project: Accolade :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Accolade Wines     2.5 MW
Energy Type: Wind Onshore
County: Avon     Country: England     LPA: Bristol City Council
Site ID and Reference: 6293 /     District:
Applicant: Clean Earth Energy     Application : 17/02240/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.5
Height of Turbines: 130 Calculated capacity: 1.5
Site Address: Accolade Wines, Kings Weston Lane, Avonmouth, Bristol, Avon
  BS11 9FG
County: Avon Region: South West
OS Coordinates: 352283 / 352283
Development Status: Operational
Application Submitted: 4/21/2017 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/1/2019    
Generator Live 6/15/2019 This Record Last Updated: 5/23/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 9/1/2020    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Accolade: Wind :

 Calculations


Capacity: 3
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 0 m/s (0 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 3 start: 5 Optimum: 15/ Stop: 0 / wind: / ratio 350187

Project Info
Avonmouth wind turbine ‘a first of its kind’ for UK business
Our turbine development for ACCOLADE Wines in Avonmouth was distinctive for several reasons. But what made it truly unique was that it was the first to be constructed for a business that did not own the property the turbine was built on.

The sky´s the limit – The first VENSYS 112 in the UK
The first VENSYS 112 in the UK was erected for our customer „ACCOLADE Wines“ in Bristol this month. The wind turbine with a 75-meter tower will be generating electric power of approximately 8 million kilowatt hours annually.

ACCOLADE Park installs wind turbine in UK business first
We are delighted to announce the installation of 130m tall, 2.5MW wind turbine at ACCOLADE Park, our state-of-the-art production, bottling and warehousing facility in Bristol, UK.

Testing Eigg's green credentials
The Isle of Eigg has been dubbed "Scotland's first green island", but what have the islanders done to deserve that ACCOLADE?

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School