Keele University Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Keele University Wind Farm (Wind , Agreed/Planning)

 General Information.

Location in the UK : England, Keele Stoke on Treent    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 1.8 MW
Approx Date of 1st power generation: 2021

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: aa 1mw or less Start Speed: 5
Capacity: 1 Optimal Speed: 15
Rotor Diameter: 20 Stop Speed: 25
Hub Height 55   Avg for all turbines:55 Avg. Elevation: 162
Web Page:
Comment:

 Address

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Keele University )

 DECC Data on this Project: Keele University :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: The Low Carbon Energy Generation Project at Keele University     1.9 MW
Energy Type: Wind Onshore
County: Staffordshire     Country: England     LPA: Newcastle Under Lyme Borough Council
Site ID and Reference: 7312 /     District:
Applicant: Keele University     Application : 18/00933/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 1
Height of Turbines: 77 Calculated capacity: 2
Site Address: Land Adj To Springpool Wood, Keele, Newcastle-Under-Lyme
  ST5 5BW
County: Staffordshire Region: West Midlands
OS Coordinates: 381909 / 381909
Development Status: Operational
Application Submitted: 12/20/2018 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/2/2020    
Generator Live 9/1/2021 This Record Last Updated: 9/1/2021
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Keele University: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 3.6 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 310141

Project Info
KEELE UNIVERSITY LOW CARBON PROJECT
The Low Carbon Energy Generation Project has now reached a stage where a planning application has been approved by the Newcastle-under-Lyme Borough Council, allowing the scheme to progress.

KEELE UNIVERSITY ‘trailblazes change’ with ENGIE solar, wind and battery deal
KEELE UNIVERSITY has signed a 25-year agreement with ENGIE that will see 15,000 solar panels, wind turbines and battery storage installed to support the institution's carbon neutral pledge.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School