Hill of Lybster Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Hill of Lybster Wind Farm (Wind , Deleted)

 General Information.

Location in the UK : Scotland, KW14 7YA    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 1.5 MW
Approx Date of 1st power generation: April 2021

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: 2B6 Start Speed: 3.5
Capacity: 6 Optimal Speed: 13
Rotor Diameter: 140 Stop Speed: 0
Hub Height 0   Avg for all turbines: Avg. Elevation:
Web Page: https://en.wind-turbine-models.com/turbines/1250-2-b-energy-2b6
Comment:

 Address

Land 200M N Of, 3 Lybster Road, Forss, Thurso, Highlands

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Hill of Lybster )

 DECC Data on this Project: Hill of Lybster :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hill of Lybster (Wind Turbine - Extension)     1.5 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 5187 /     District:
Applicant: The Energy Workshop     Application : 17/04934/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.5
Height of Turbines: 100 Calculated capacity: 1.5
Site Address: Land 200M N Of, 3 Lybster Road, Forss, Thurso, Highlands
  KW14 7YA
County: Highland Region: Scotland
OS Coordinates: 302481 / 302481
Development Status: Operational
Application Submitted: 10/20/2017 Planning Permission Granted
Application Determined: Permission refused: 8/16/2018
Construction Date:    
Generator Live 4/12/2021 This Record Last Updated: 10/2/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/16/2018

Site Name: Hill of Lybster     4.9 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 3309 / S0036W3     District:
Applicant: Fivestone Ltd (subsidiary of Abbey Produce)     Application : CA2001030 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 5.2
Site Address: Forss Phase 2, Caithness
 
County: Highland Region: Scotland
OS Coordinates: 302000 / 302000
Development Status: Operational
Application Submitted: 4/28/2000 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/8/2003 This Record Last Updated: 6/9/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hill of Lybster: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351731

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School