Sorry I found no matches, Please try again. 176
vid = 70pws_id = 350703pws_id = 350703 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.144.117.52 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Brenig Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Brenig Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Denbigh, North Wales    
Type of installation: Wind    on/offshore: on
Turbines :16  Capacity : 40 MW
Approx Date of 1st power generation: October 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Although initial scoping of the site showed that the proposed site at Brenig might be suitable for up to 23 turbines, after applying a number of project constraints on the area and taking into account the views of local people, the number of wind turbines was reduced to 16 in the 2-2.5MW range.

The consented development of 16 turbines will have the installed generation capacity of up to 40MW of electricity, enough to power the annual equivalent demand of 20,000+ homes. On average it is envisaged that the wind farm will produce an output of 105,120MW hours/year, i.e. 30% of what it would produce if it were operating continually at maximum output.

During the 25 year lifetime it will cut emissions of carbon dioxide by 2.26million tonnes, sulphur dioxide by 2,625 tonnes, and nitrous oxide by 525 tonnes, helping to combat climate change.

 Turbine Make and Specs

Model: Vestas V80 Start Speed: 4
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 80 Stop Speed: 25
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 469
Web Page:
Comment:

 Address

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Brenig )

 DECC Data on this Project: Brenig :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Brenig Wind Farm     37.6 MW
Energy Type: Wind Onshore
County: Denbighshire     Country: Wales     LPA: Denbighshire County Council
Site ID and Reference: 5598 /     District:
Applicant: CGNEE     Application : 25/2015/0636 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 16 Turbine Capacity: 2.3500000000000001
Height of Turbines: 110 Calculated capacity: 37.6
Site Address: Land east of Llyn Brenig, Nantglyn, Denbigh,
 
County: Denbighshire Region: Wales
OS Coordinates: 299481 / 299481
Development Status: Operational
Application Submitted: 6/18/2015 Planning Permission Granted
Application Determined: Permission refused: 11/19/2015
Construction Date: 8/24/2017    
Generator Live 10/15/2018 This Record Last Updated: 11/21/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 1/27/2016
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 11/19/2015

Site Name: Brenig Wind Farm     40 MW
Energy Type: Wind Onshore
County: Denbighshire     Country: Wales     LPA: Denbighshire County Council
Site ID and Reference: 4082 / A0160     District:
Applicant: Wind Power Wales     Application : 25/2007/0565 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 16 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 40
Site Address: Denbigh Moors, Denbigh,
 
County: Denbighshire Region: Wales
OS Coordinates: 304304 / 304304
Development Status: Revised
Application Submitted: 4/26/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 5/31/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Brenig: Wind :

 Calculations


Capacity: 80
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 80 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350703

Project Info
Rolling road blocks could hit Shropshire border routes
The Clocaenog Forest wind farm will see 27 turbines put up within the forest near the popular Llyn BRENIG beauty spot in Denbighshire.

Proven Management
FIM secures one of only fifteen CFDs granted to onshore wind projects, for BRENIG Wind Farm. Harburnhead Wind Farm construction starts in earnest in the New Year with civil works by Farrans.

The BRENIG Project

Llyn BRENIG eco-village scuppered by windfarm

Windfarm owner claims rival operation would ‘steal our wind’
And it has now emerged one of the more bizarre objections to the BRENIG proposal came from the managers of the 25-turbine windfarm Tir Mostyn, immediately to the north and east of the proposal.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School