Burbo Bank Wind Farm (Wind , Active) Location in the UK : England, Merseyside Type of installation: Wind on/offshore: off Turbines :25 Capacity : 90 MW Approx Date of 1st power generation: October 2007
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The Burbo Bank Extension offshore wind farm was awarded an agreement for lease by The Crown Estate on 11 May 2010. This will extend the existing Burbo Bank offshore wind farm by a further 258 MW (approximately).
Emerson Network Power are supplying the critical infrastructure for the substations, UPS etc
Burbo Bank Extension to use Vestas V164 8MW
69 wind turbines to be added to the existing scheme (agreed)
The Burbo 90MW offshore wind farm uses Siemens 3.6MW turbines, the largest yet to be installed in UK waters. The Dong Energy project which starts generation in October was developed by Wind Prospect.
Vestas aims to start serial production of 80 metre blades in the second quarter of 2015, which will be used for the new 8MW turbine that has provisionally been chosen for Dong Energy’s Burbo Bank extension project in Liverpool Bay.
The Burbo Bank Extension offshore wind farm was awarded an agreement for lease by The Crown Estate on 11 May 2010. This will extend the existing Burbo Bank offshore wind farm by a further 258 MW (approximately).
Model: |
Siemens SWT 3.6 120
|
Start Speed: |
4
|
Capacity: |
3.6
|
Optimal Speed: |
12
|
Rotor Diameter: |
120
|
Stop Speed: |
25
|
Hub Height |
85 Avg for all turbines:85
|
Avg. Elevation: |
|
Web Page: |
http://www.energy.siemens.com/hq/en/renewable-energy/wind-power/wind-turbines/swt-3-6-120.htm |
Comment: |
|
Burbo Offshore Windfarm North Wirral and Liverpool Coastline England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Burbo Bank Extension (Burbo Bank 2) 258 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
2539 / AA066
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
EN010026
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
32 |
Turbine Capacity: |
8 |
Height of Turbines: |
|
Calculated capacity: |
256 |
Site Address: |
Burbo Flats, Liverpool Bay, approximately 6.4km (4.0 miles) from the Sefton coastline and 7.2km (4.5 miles) from North Wirral.
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
315815 / 315815
|
Development Status: |
Operational
|
Application Submitted: |
3/22/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/10/2016
|
|
|
Generator Live |
4/27/2017
|
This Record Last Updated: |
5/2/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Burbo Bank 90 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2487 / N00445W
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
25 |
Turbine Capacity: |
3.6000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
90 |
Site Address: |
Burbo Flats, Liverpool Bay, approximately 6.4km (4.0 miles) from the Sefton coastline and 7.2km (4.5 miles) from North Wirral.
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
321476 / 321476
|
Development Status: |
Operational
|
Application Submitted: |
4/12/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2006
|
|
|
Generator Live |
10/18/2007
|
This Record Last Updated: |
2/27/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Burbo Offshore Windfarm - A (31/01/07)
|
Generator Type: |
Off-shore wind (RO code = RP)
|
Scheme : |
RO
|
Generator ID: |
R00008RPEN
|
Capacity: |
90000
|
Status: |
Live
|
Accreditation Date: |
4/12/2002
|
|
|
Commission Date: |
7/1/2007
|
|
|
Applicant: |
SeaScape Energy Ltd
|
Applicant Address: |
C/O DONG Energy
A.C. Meyers Vaenge 9
2450 Copenhagen SV Denmark
na
|
Address: |
Burbo Offshore Windfarm- A (31/01/07)
6.4 kM from the North Wirral and Liverpool Coastli
England
|
Site Name: |
Burbo Offshore Windfarm - A (31/01/07)
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G01152FWEN
|
Capacity: |
90000
|
Status: |
Live
|
Accreditation Date: |
4/12/2002
|
|
|
Commission Date: |
7/1/2007
|
|
|
Applicant: |
SeaScape Energy Ltd
|
Applicant Address: |
C/O DONG Energy
A.C. Meyers Vaenge 9
2450 Copenhagen SV Denmark
na
|
Address: |
Burbo Offshore Windfarm- A (31/01/07)
6.4 kM from the North Wirral and Liverpool Coastli
England
|
|
Assumptions: Capacity: 90000kW 90 MW, Thus over the month Capacity * 720 hours per month = 64800 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 19828 | 22.03% | Issued | 01/03/2018 | | | 25419 | 28.24% | Issued | 01/02/2018 | | | 25894 | 28.77% | Issued | 01/01/2018 | | | 37552 | 41.72% | Issued | 01/12/2017 | | | 28325 | 31.47% | Issued | 01/11/2017 | | | 4014 | 4.46% | Issued | 01/09/2017 | | | 17865 | 19.85% | Issued | 01/08/2017 | | | 17296 | 19.22% | Issued | 01/07/2017 | | | 15148 | 16.83% | Issued | 01/06/2017 | | | 20858 | 23.18% | Issued | 01/05/2017 | | | 14866 | 16.52% | Issued | 01/04/2017 | | | 10192 | 11.32% | Issued | 01/04/2017 | | | 10000 | 11.11% | Retired | 01/03/2017 | | | 2768 | 3.08% | Redeemed | 01/03/2017 | | | 20295 | 22.55% | Redeemed | 01/02/2017 | | | 3334 | 3.70% | Redeemed | 01/02/2017 | | | 24448 | 27.16% | Retired | 01/01/2017 | | | 22717 | 25.24% | Retired | 01/01/2017 | | | 3098 | 3.44% | Redeemed | Dec-16 | 0 | 37136 | 24758 | 27.51% | Issued | Nov-16 | 0 | 36461 | 21391 | 23.77% | Retired | Oct-16 | 0 | 22461 | 14974 | 16.64% | Issued | Sep-16 | 0 | 32134 | 21423 | 23.80% | Issued | Aug-16 | 0 | 34322 | 22881 | 25.42% | Issued | Jul-16 | 0 | 29464 | 19643 | 21.83% | Issued | Jul-16 | 0 | 29464 | 15643 | 17.38% | Issued | May-16 | 0 | 22281 | 14854 | 16.50% | Issued | Jan-16 | 0 | 56514 | 36546 | 40.61% | Issued | Dec-15 | 0 | 69325 | 46217 | 51.35% | Retired | Nov-15 | 0 | 56814 | 37876 | 42.08% | Retired | Oct-15 | 0 | 25300 | 16867 | 18.74% | Retired | Sep-15 | 0 | 20707 | 13805 | 15.34% | Retired | Aug-15 | 0 | 26586 | 17724 | 19.69% | Retired | Jul-15 | 24650 | 36975 | 3698 | 4.11% | Redeemed | Jun-15 | 18650 | 27976 | 8207 | 9.12% | Redeemed | May-15 | 31513 | 47270 | 13866 | 15.41% | Redeemed | Apr-15 | 18414 | 27421 | 2762 | 3.07% | Redeemed | Mar-15 | 30756 | 46134 | 20607 | 22.90% | Redeemed | Feb-15 | 24171 | 36257 | 16195 | 17.99% | Redeemed | Jan-15 | | 59742 | 13143 | 14.60% | Redeemed | Dec-14 | | 59468 | 26561 | 29.51% | Redeemed | Nov-14 | 23095 | 34642 | 7621 | 8.47% | Redeemed | Oct-14 | 31590 | 47386 | 21165 | 23.52% | Redeemed | Sep-14 | 7417 | 10941 | 2448 | 2.72% | Redeemed | Aug-14 | 30164 | 45246 | 9954 | 11.06% | Redeemed | Jul-14 | 13007 | 19511 | 8714 | 9.68% | Redeemed | Jun-14 | 7908 | 11765 | 5299 | 5.89% | Redeemed | May-14 | 17557 | 26336 | 5793 | 6.44% | Redeemed | Apr-14 | 19586 | 29379 | 13123 | 14.58% | Redeemed | Mar-14 | 29273 | 43910 | 1756 | 1.95% | Retired | Feb-14 | 40002 | 60003 | 2400 | 2.67% | Redeemed | Jan-14 | 34294 | 51442 | 26406 | 29.34% | Redeemed | Dec-13 | 39342 | 59012 | 6687 | 7.43% | Redeemed | Nov-13 | 27233 | 40850 | 1512 | 1.68% | Redeemed | Oct-13 | 35393 | 53089 | 27252 | 30.28% | Redeemed | Sep-13 | 20994 | 31492 | 1259 | 1.40% | Redeemed | Aug-13 | 19042 | 28563 | 1142 | 1.27% | Redeemed | Jul-13 | 9093 | 13525 | 1545 | 1.72% | Redeemed | Jun-13 | 18317 | 27474 | 3114 | 3.46% | Redeemed | May-13 | 20862 | 31293 | 3546 | 3.94% | Redeemed | Apr-13 | 28011 | 42017 | 1680 | 1.87% | Redeemed | Mar-13 | 22378 | 33567 | 22378 | 24.86% | Expired | Feb-13 | 23342 | 35013 | 23342 | 25.94% | Expired | Jan-13 | 27931 | 41895 | 27930 | 31.03% | Expired | Dec-12 | 33690 | 50536 | 33690 | 37.43% | Expired | Nov-12 | 26161 | 39242 | 26161 | 29.07% | Redeemed | Oct-12 | 22342 | 33513 | 22342 | 24.82% | Redeemed | Sep-12 | 27964 | 41946 | 27964 | 31.07% | Redeemed | Aug-12 | 17900 | 26850 | 17900 | 19.89% | Redeemed | Jul-12 | 18017 | 27024 | 18016 | 20.02% | Redeemed | Jun-12 | 21778 | 32668 | 21779 | 24.20% | Redeemed | May-12 | 10656 | 15984 | 10656 | 11.84% | Redeemed | Apr-12 | 10287 | 15430 | 10287 | 11.43% | Redeemed | Mar-12 | 15548 | 23322 | 13060 | 14.51% | Redeemed | Feb-12 | 22545 | 33818 | 18937 | 21.04% | Redeemed | Jan-12 | 30133 | 45200 | 25311 | 28.12% | Redeemed | Dec-11 | 38497 | 57745 | 32338 | 35.93% | Redeemed | Nov-11 | 28223 | 42335 | 23708 | 26.34% | Redeemed | Oct-11 | 32855 | 49282 | 27599 | 30.67% | Redeemed | Sep-11 | 27918 | 41877 | 23451 | 26.06% | Redeemed | Aug-11 | 17958 | 26937 | 15084 | 16.76% | Redeemed | Jul-11 | 13856 | 20655 | 2217 | 2.46% | Expired | Jun-11 | 18481 | 27722 | 15524 | 17.25% | Redeemed | May-11 | 36431 | 54646 | 5829 | 6.48% | Expired | Apr-11 | 17471 | 26207 | 3076 | 3.42% | Redeemed | Mar-11 | 12681 | 18816 | 12681 | 14.09% | Redeemed | Feb-11 | 27881 | 41822 | 27881 | 30.98% | Redeemed | Jan-11 | 20910 | 31365 | 20910 | 23.23% | Redeemed | Dec-10 | 17213 | 25819 | 17213 | 19.13% | Redeemed | Nov-10 | 23838 | 35757 | 23838 | 26.49% | Redeemed | Oct-10 | 21632 | 32448 | 21632 | 24.04% | Redeemed |
|
Capacity: 200 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|