Caton Moor Wind Farm (Wind , Active) Location in the UK : England, Lancashire Type of installation: Wind on/offshore: on Turbines :8 Capacity : 16 MW Approx Date of 1st power generation: July 2006
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Triodos Renewables have used a Triodos Bank loan to finance Caton Moor wind farm, one of the first projects in England of its kind. Ten original turbines have been replaced with eight larger, more efficient machines. The wind farm now produces enough energy for the equivalent of 10,000 homes.
Model: |
Senvion MM70
|
Start Speed: |
3.5
|
Capacity: |
2
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
70
|
Stop Speed: |
25
|
Hub Height |
59 Avg for all turbines:51
|
Avg. Elevation: |
268
|
Web Page: |
|
Comment: |
|
Caton Moor Wind Farm Caton MoorQuarry House FarmBrook House Caton England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Caton Moor Windfarm Repowering 16 MW
|
Energy Type: |
Wind Onshore |
County: |
Lancashire Country: England LPA: Lancaster City Council
|
Site ID and Reference: |
3171 / N00150W
District:
|
Applicant: |
Hainsford Energy
Application :
21331
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
8 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
16 |
Site Address: |
Littledale,
Caton
Lancashire
|
|
|
County: |
Lancashire Region: North West
|
OS Coordinates: |
357298 / 357298
|
Development Status: |
Operational
|
Application Submitted: |
11/7/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
9/10/2003
|
Construction Date: |
5/1/2006
|
|
|
Generator Live |
6/1/2006
|
This Record Last Updated: |
5/6/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
9/10/2003 |
Site Name: |
Caton Moor Wind Farm - A
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01434NWEN
|
Capacity: |
16000
|
Status: |
Live
|
Accreditation Date: |
11/7/2002
|
|
|
Commission Date: |
1/1/1995
|
|
|
Applicant: |
Triodos Renewables Ltd
|
Applicant Address: |
Triodos Bank
Deanery Road
Bristol
BS1 5AS
England
|
Address: |
Caton Moor Wind Farm
Caton MoorQuarry House FarmBrook HouseCaton
England
|
|
Assumptions: Capacity: 16000kW 16 MW, Thus over the month Capacity * 720 hours per month = 11520 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 4523 | 28.27% | Issued | 01/02/2018 | | | 3364 | 21.03% | Issued | 01/01/2018 | | | 5226 | 32.66% | Issued | 01/12/2017 | | | 3037 | 18.98% | Issued | 01/11/2017 | | | 2408 | 15.05% | Issued | 01/10/2017 | | | 4097 | 25.61% | Issued | 01/09/2017 | | | 2108 | 13.18% | Issued | 01/08/2017 | | | 2006 | 12.54% | Issued | 01/07/2017 | | | 2452 | 15.33% | Issued | 01/06/2017 | | | 3379 | 21.12% | Issued | 01/05/2017 | | | 2800 | 17.50% | Issued | 01/04/2017 | | | 1898 | 11.86% | Issued | 01/03/2017 | | | 4258 | 26.61% | Redeemed | 01/02/2017 | | | 4767 | 29.79% | Redeemed | 01/01/2017 | | | 3147 | 19.67% | Redeemed | Dec-16 | 0 | 4548 | 4548 | 28.43% | Issued | Nov-16 | 0 | 2215 | 2215 | 13.84% | Issued | Oct-16 | 0 | 2795 | 2795 | 17.47% | Issued | Sep-16 | 0 | 3663 | 3663 | 22.89% | Issued | Aug-16 | 0 | 3247 | 3247 | 20.29% | Issued | Jul-16 | 0 | 2326 | 2326 | 14.54% | Issued | Jul-16 | 0 | 2326 | 2326 | 14.54% | Pending Tr | Jun-16 | 0 | 1048 | 1058 | 6.61% | Issued | May-16 | 0 | 2757 | 2757 | 17.23% | Issued | Apr-16 | 0 | 2652 | 2652 | 16.58% | Issued | Mar-16 | 0 | 2427 | 2427 | 15.17% | Redeemed | Feb-16 | 0 | 3706 | 3706 | 23.16% | Redeemed | Jan-16 | 0 | 4884 | 4884 | 30.53% | Redeemed | Dec-15 | 0 | 5004 | 5004 | 31.28% | Redeemed | Nov-15 | 0 | 5614 | 5614 | 35.09% | Redeemed | Oct-15 | 0 | 2599 | 2599 | 16.24% | Redeemed | Sep-15 | 0 | 1790 | 1790 | 11.19% | Redeemed | Aug-15 | 0 | 2629 | 2629 | 16.43% | Redeemed | Jul-15 | 3016 | 3016 | 3016 | 18.85% | Redeemed | Jun-15 | 2337 | 2338 | 2338 | 14.61% | Redeemed | May-15 | 4751 | 4751 | 4751 | 29.69% | Redeemed | Apr-15 | 2581 | 2580 | 2580 | 16.13% | Redeemed | Mar-15 | 5063 | 5063 | 5063 | 31.64% | Redeemed | Feb-15 | 3172 | 3172 | 3172 | 19.83% | Redeemed | Jan-15 | 5718 | 5718 | 5718 | 35.74% | Redeemed | Dec-14 | 5084 | 5084 | 5084 | 31.78% | Redeemed | Nov-14 | 4256 | 4256 | 4256 | 26.60% | Redeemed | Oct-14 | 5473 | 5473 | 5473 | 34.21% | Redeemed | Sep-14 | 1243 | 1234 | 1244 | 7.78% | Redeemed | Aug-14 | 3694 | 3694 | 3694 | 23.09% | Redeemed | Jul-14 | 1740 | 1739 | 1739 | 10.87% | Redeemed | Jun-14 | 917 | 905 | 917 | 5.73% | Redeemed | May-14 | 2731 | 2731 | 2731 | 17.07% | Redeemed | Apr-14 | 3612 | 3612 | 3612 | 22.58% | Redeemed | Mar-14 | 4877 | 4877 | 4877 | 30.48% | Expired | Feb-14 | 5553 | 5553 | 5553 | 34.71% | Expired | Jan-14 | 5812 | 5812 | 5812 | 36.33% | Redeemed | Dec-13 | 6264 | 6264 | 6264 | 39.15% | Redeemed | Nov-13 | 2424 | 2431 | 2430 | 15.19% | Redeemed | Oct-13 | 6017 | 6018 | 6018 | 37.61% | Redeemed | Sep-13 | 2902 | 2902 | 2902 | 18.14% | Redeemed | Aug-13 | 2300 | 2299 | 2299 | 14.37% | Redeemed | Jul-13 | 1523 | 1523 | 1523 | 9.52% | Redeemed | Jun-13 | 2206 | 2206 | 2206 | 13.79% | Redeemed | May-13 | 3589 | 3589 | 3589 | 22.43% | Redeemed | Apr-13 | 4557 | 4560 | 4560 | 28.50% | Redeemed | Mar-13 | 4638 | 4637 | 4637 | 28.98% | Redeemed | Feb-13 | 2744 | 2744 | 2744 | 17.15% | Redeemed | Jan-13 | 4636 | 4636 | 4636 | 28.98% | Redeemed | Dec-12 | 4775 | 4775 | 4775 | 29.84% | Redeemed | Nov-12 | 3898 | 3898 | 3898 | 24.36% | Redeemed | Oct-12 | 3953 | 3953 | 3953 | 24.71% | Redeemed | Sep-12 | 3567 | 3566 | 3566 | 22.29% | Redeemed | Aug-12 | 3022 | 3022 | 3022 | 18.89% | Redeemed | Jul-12 | 2279 | 2279 | 1220 | 7.63% | Redeemed | Jun-12 | 3700 | 3700 | 3700 | 23.13% | Redeemed | May-12 | 2598 | 2599 | 2599 | 16.24% | Redeemed | Apr-12 | 2696 | 2695 | 2695 | 16.84% | Redeemed | Mar-12 | 2305 | 2306 | 2306 | 14.41% | Redeemed | Feb-12 | 3026 | 3026 | 3026 | 18.91% | Redeemed | Jan-12 | 4910 | 4910 | 4910 | 30.69% | Redeemed | Dec-11 | 5586 | 5586 | 5586 | 34.91% | Redeemed | Nov-11 | 6379 | 6379 | 6379 | 39.87% | Redeemed | Oct-11 | 5437 | 5436 | 5436 | 33.98% | Redeemed | Sep-11 | 4735 | 4735 | 4735 | 29.59% | Redeemed | Aug-11 | 2066 | 2066 | 2066 | 12.91% | Redeemed | Jul-11 | 1454 | 1454 | 1454 | 9.09% | Redeemed | Jun-11 | 2209 | 2208 | 2208 | 13.80% | Redeemed | May-11 | 6001 | 6002 | 6002 | 37.51% | Redeemed | Apr-11 | 3372 | 3371 | 3371 | 21.07% | Redeemed | Mar-11 | 2540 | 2550 | 2550 | 15.94% | Redeemed | Feb-11 | 4199 | 4201 | 4201 | 26.26% | Redeemed | Jan-11 | 3269 | 3277 | 3277 | 20.48% | Redeemed | Dec-10 | 1349 | 1339 | 1349 | 8.43% | Redeemed | Nov-10 | 3525 | 3530 | 3530 | 22.06% | Redeemed | Oct-10 | 4446 | 4449 | 4449 | 27.81% | Redeemed |
|
Capacity: 30 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|