Causeymire Wind Farm, located at Achkeepster, on the A9 road, 30km south west of John O'Groats, became fully operational in 2004. Causeymire consists of 21 turbines, and is capable of generating more than 48 megawatts (MW) of renewable electricity.
Even taking into consideration times of low wind speeds, Causeymire is powerful enough to supply clean electricity to approximately 25,000 homes each year, put another way, enough to meet the annual domestic electricity needs of Caithness twice over*1.
An application has been made to allow an additional 3 turbines, already consented by the Highland Council, to be constructed and generate on the existing site. This would increase the capacity to more than 55 megawatts, raising the number of homes Causeymire can supply each year to some 28,500.
Model: |
Bonus B82/2.3
|
Start Speed: |
3.5
|
Capacity: |
2.3
|
Optimal Speed: |
15
|
Rotor Diameter: |
0
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
84
|
Web Page: |
|
Comment: |
|
Causeymire Wind Farm Achkeepster Watten Wick Caithness KW1 5XR
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Causeymire 48.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
3108 / N00044W
District:
|
Applicant: |
Innogy (formerly RWE npower)
Application :
01/00361/FULCA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
24 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
48 |
Site Address: |
Causey Mire, Caithness, Highlands
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
336736 / 336736
|
Development Status: |
Operational
|
Application Submitted: |
11/1/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
6/1/2004
|
This Record Last Updated: |
5/18/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 195.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/4/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Caithness farmers claim noise from surrounding wind farms is making them ill Hamish and Lesley Ritchie keep around 170 sheep on rough grazing at Achaguie Farm, Scotscalder.
They are within earshot of 42 wind turbines – 21 at CAUSEYMIRE and 21 at Baillie, near Reay.
Youtube: CAUSEYMIRE Wind Farm
CAUSEYMIRE Wind Farm
(2012) Caithness Spittal Hill wind farm plans rejected The area already has CAUSEYMIRE, Flex Hill and Achairn wind farms, while one at Camster has planning consent and another farm has been proposed for Halsary.
Wind farm 'would affect Wick airport' The other farms are at Forss, CAUSEYMIRE, Boulfruich, Flexhill, Achairn, Baillie, Camster, Bettyhill, Strathy North, Strathy South, South Shebster, Hill of Lieurary, Burn of Whilk, Stroupster, Bower, Durran, Olgrinmore, Halsary and Wathegar.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|