List of major Renewable Energy Schemes in the UK going live in 1995
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.222.120.124
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Blantyre Hydro 0.575 Scotland G72 9BX East Lothian 0 / 1995 9/30/2016  
 1
  Rigged Hill Wind Farm Wind 5 N.Ireland Co. Londonderry 3 / 1995 11/18/2016  
 1
  ElliotsHill Wind Farm Wind 5 N.Ireland Co. Antrim 4 / 1995 12/3/2017  
 1
  Borrowash Mill Hydro 0.179 England DE72 3LJ Derbyshire 4 / 1995 1/5/2017  
 1
  Four Burrows Wind Farm Wind 4.5 England Cornwall 5 / 1995 3/31/2016  
 1
  Distington Landfill Waste 1.778 England CA15 4JY Cumbria 6 / 1995 11/1/2016  
 1
  BUTCHERSFIELD Waste 2.874 England WA3 6EW Cheshire 10 / 1995 3/11/2016  
 1
  Old Walls Hydro 0.076 England TQ13 7PN Devon 12 / 1995 1/5/2017  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.