Header Area
Contact
Welcome to Renewables Map.

Loading

List of major Renewable Energy Schemes in the UK going live in 1999
Other Projects: Wind Farms | Hydro Schemes | Biomass | Waste | CHP | Wave & Tidal | Solar |    

Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.97.14.83
Active and Currently Generating
Building or Planning Approved
Proposed
  Refused or Cancelled (new listing)   NO
session(showworking) = librarian =
Status
Tech
  Projects currently Generating
 1
  Currabwee Wind Farm Wind 4.62 S.Ireland Co. Cork 0 / 1999 4/2/2019  
 1
  Haroy Wind Farm Wind 3.75 Norway Møre og Romsdal 0 / 1999 5/23/2019  
 1
  Klokbekertocht Wind Farm Wind 12 Holland Netherlands 0 / 1999 4/15/2019  
 1
  Rivierduintocht Wind Farm Wind 12 Holland Netherlands 0 / 1999 4/15/2019  
 1
  Haroy Wind Farm Wind 3.75 Norway Morayshire 0 / 1999 5/23/2019  
 1
  JUDKINS Waste 2.73 England CV10 0HU Warwickshire 1 / 1999 10/28/2016  
 1
  Burnt Stump Waste 0.963 England NG5 8PR Nottinghamshire 1 / 1999 10/18/2016  
 1
  Bernard Road Waste 2.1 England S4 7YX Yorkshire 1 / 1999 12/12/2016  
 1
  Whinney Hill Waste 2.7 England BB5 6NN Lancashire 1 / 1999 10/29/2016  
 1
  Inverin Wind Farm Wind 3.96 S.Ireland Co. Galway 2 / 1999 11/3/2017  
 1
  Boston Waste 1.275 England PE21 7AA Lincolnshire 3 / 1999 11/1/2016  
 1
  HILL AND MOOR Waste 3.38 England WR10 2PW Worcestershire 3 / 1999 10/28/2016  
 1
  Royal Seaforth Dock Wind Farm Wind 3.6 England L20 1BG Merseyside 4 / 1999 6/17/2016  
 1
  BURNTSTUMP Waste 1.8 England NG5 8PR Nottinghamshire 4 / 1999 10/8/2016  
 1
  Beinn Ghlas Wind Farm Wind 8.4 Scotland PA35 1HY Argyllshire 5 / 1999 10/11/2016  
 1
  Enderby Warren Waste 4.875 England LE9 5AL Leicestershire 6 / 1999 10/6/2016  
 1
  Thetford Biomass 38.5 England Norfolk 6 / 1999 10/6/2016  
 1
  Summerston Waste 2.78 Scotland G23 5HD Strathclyde 7 / 1999 10/28/2016  
 1
  Far Old Park Wind Farm Wind 4.62 England LA16 7UD Cumbria 7 / 1999 11/15/2016  
 1
  ECOTECH Wind Farm Wind 1.47 England PE37 7HT Norfolk 8 / 1999 2/27/2016  
 1
  Bromborough Waste 2.95 England L62 4SQ Cheshire 9 / 1999 5/18/2017  
 1
  Station Farm Waste 1.956 England PE18 9UH Cambridgeshire 9 / 1999 11/11/2016  
 1
  EcoTech Wind Farm Wind 1.5 England PE37 7HT Norfolk 10 / 1999 2/21/2016  
 1
  Croesor Hydro 0.5 Scotland LL48 655 Aberdeenshire 11 / 1999 9/30/2016  
 1
  Ufton Waste 0.93 Wales CV33 9PP Warwickshire 11 / 1999 2/20/2017  
 1
  Beeston Weir Hydro 1.66 England NG11 8NB Nottinghamshire 12 / 1999 1/5/2017  
 1
  Winscales Wind Farm Wind 7.3 England CA14 4JG Cumbria 12 / 1999 11/18/2016  
 1
  Tarn Bank Wind Farm Wind 0.845 England CA14 4JG Cumbria 12 / 1999 1/5/2017  
 9
  Askam Delete 2.303 England LA16 7UD Cumbria 7 / 1999 11/15/2016  
Status
  Site Name
Tech Capacity Region Postcode County Applied Approved   Go Live Updated

Back to map


Our aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.

Comments and Additional information
about:

Please regard the following as optional:
Your name and any other contact information:

Contact email address

Before submitting, please enter this code.access code
All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.

Recent News:

Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00



Can you help?  

The aim is to continually improve this resource. If you can provide additional information such as relevant links, perhaps the status of the project, please use the form below.
Any additional information or corrections always gratefully accepted.
Site:
Comment:

Optional name/email and any other contact information, I like to say thanks:

Before submitting, please enter this code
.access code

All letters to be entered as lower case:
Sadly, this is necessary to reduce the volume of inappropriate emails that we receive.